# Ship-Shore Variance

> Ship-shore variance is the difference between the quantity a vessel measures and the shore figure for the same cargo, usually after applying the vessel's VEF.

- Also called: ship/shore difference
- Publisher: Navarik
- Web page: https://www.navarik.com/resources/glossary/ship-shore-variance/
- Related solution: [Loss Control & Quality](https://www.navarik.com/solutions/loss-control-quality/)
- Related solution: [VEF & Hydrocarbon Loss](https://www.navarik.com/solutions/vef-hydrocarbon-loss/)

Ship-shore variance is the difference between what a vessel measures in its tanks and what the terminal measures for
the same cargo. It is expressed in barrels, cubic meters or tonnes, and as a percentage of the shore figure. Before the
two are compared, the ship's figure is usually corrected with its vessel experience factor (VEF), so the variance
reflects the cargo rather than the way that ship measures.

## Where it is measured

A marine cargo is measured at four points, which give four comparisons:

| Comparison | What it shows |
|---|---|
| Shore (bill of lading) against ship after loading | Loading variance, after applying the loading VEF |
| Ship after loading against ship before discharge | Transit variance, using the vessel's own figures |
| Ship before discharge against shore outturn | Discharge variance, after applying the discharge VEF |
| Bill of lading against shore outturn | Total variance from load port to discharge port |

Looking at all four together, a four-point reconciliation, shows where in the journey a difference arose. A cargo
that is short at outturn but balanced in transit points to the measurement at one of the terminals, not to the
voyage.

## Common causes

- **An outdated or missing VEF**, so the ship's normal measurement bias is mistaken for a loss, or hides one.
- **Shore measurement**: tank gauging, meter proving, line fill and the timing of opening and closing gauges.
- **Ship measurement**: trim and list corrections, temperature, and on-board quantity (OBQ) or remaining on board (ROB).
- **Quality data**: density and sediment and water (S&W) results that change the standard volume.
- **Real losses**: evaporation, leaks, contamination, or cargo not delivered.

## Tolerance and what happens outside it

Contracts and loss control policies set a tolerance, usually a fraction of a percent. Within it, figures are accepted.
Outside it, the cargo owner and inspector typically recheck calculations and documents, retest retained samples,
issue letters of protest and, where the evidence supports it, file a claim. All of this has to happen within the
claim window, so a variance that is found weeks later is often a write-off rather than a recovery.

## How Navarik helps

NI calculates the VEF on every movement and flags ship-shore differences outside tolerance as soon as inspector results
arrive, leaving time to request a retest and log it against the original result. Inspection companies on IMS send
results straight to NI. See [Loss Control & Quality](https://www.navarik.com/solutions/loss-control-quality/) for how loss control teams use
it, and [VEF & Hydrocarbon Loss](https://www.navarik.com/solutions/vef-hydrocarbon-loss/) for the VEF calculator.