
Solutions — Operations & Scheduling
See the conflict coming.
Not the morning it lands.
For operations managers, schedulers, and logistics directors managing cargo nominations, vessel arrivals, and inspection coordination across marine, pipeline, and rail.
- Movement lifecycle reduced by
- 1-3 days
- Scheduling hours saved monthly
- 75 hours
- Demurrage avoided
- 50%
- Team collaboration via
- One view
Where the gaps are
Five problems every operations team recognizes.
- 01
Nomination confirmations lost in email
Operational and inspection instructions sent by email with no system record. When a nomination is disputed or a window missed, reconstruction is guesswork — emails versus emails.
- 02
Berth conflicts caught on the day
Vessel scheduling managed in spreadsheets or on whiteboards. Conflicts between arrivals surface the morning of, not the week before, when there was still time to act.
- 03
Inspector status invisible until the report lands
No visibility into whether an inspector is on site, sampling, or delayed. The first sign something went wrong is the late report, not the late inspector.
- 04
Inspection job coordination by phone and email
For inspection companies, assigning jobs, tracking field teams, and chasing completed certificates requires constant manual follow-up across a distributed workforce.
- 05
Lifting schedules out of step with production
Lifting plans are built on a forecast in one spreadsheet and entitlements in another, and the mismatch shows up once the tanker is already nominated.
How Navarik closes them
Structured data at every operational touchpoint.
- NI
Nominations structured from the start.
NI creates ASTM/API-compliant nominations with all relevant parameters captured — product, quantity, inspector, terms. Every nomination has a timestamped record that both parties can reference.
- OAS
Berth scheduling with conflict detection.
OAS surfaces berth conflicts before vessels arrive and gives operations teams a single scheduling interface with built-in constraints — drag-and-drop, not a shared spreadsheet.
- NI
Inspector status in real time.
NI shows inspector activity throughout the inspection — job accepted, on site, sampling complete. Commercial and logistics teams see status as it happens, not after the fact.
- IMS
Inspection job management end to end.
IMS manages the inspection company side — job assignment, field team tracking, field measurement capture, and certificate generation without a transcription step.
- AXIS
Tanker lifting schedules aligned to production.
AXIS tracks production against entitlement and plans lifting schedules at the upstream source — so the cargo that arrives at the terminal or refinery reflects what was actually produced and allocated.
Self-guided diagnostic
Not ready for a call?
Find where your
shipments take on risk.
Score your operation across two critical layers of the energy supply chain — refinery scheduling and cargo measurement. Each section takes about 3 minutes. Get your score, see where the gaps are, and what closing them could be worth.
- Refinery Operations OAS Berth scheduling, demurrage, throughput · about 3 min
- Cargo Measurement & Inspection NI Inspector nomination, quantity variance, disputes · about 3 min
Relevant products
- NI Nomination & Inspection Nomination management, inspector coordination, and real-time field status for cargo owners and traders.
- OAS Oil Accounting & Shipping Berth planning, vessel scheduling, and demurrage management for refineries and terminal operators.
- IMS Inspection Management System End-to-end inspection job management for independent inspection companies.
- AXIS Hydrocarbon Accounting Lifting schedule management aligned to upstream production entitlements and JV allocations.